Strength and Conditioning Lab
5th October 2016News
RV Dart completed the strength and conditioning lab. This was part of a refurbishment this summer at the Centre for Sport at the University of Winchester.
JCT intermediate contract
Contract – May – September 2016
Outurn cost – £425k
Architect/Principal Designer – Studio 4, Winchester
QS – Ridge
Services Engineer – ITD
Structural Engineer – Paul Tanner Associates