The job was a fast track summer holiday project at the Shakespeare Junior School, Eastleigh. This was a demolition of an existing covered external space between two buildings. The project then consisted of the formation of a new extension to link the two buildings, providing a new entrance, lobby, reception, medical room and teaching / circulation space. The first two images at the top are taken of the old covered external space. The lower two photographs show the completed new works.