Author: John

E2 Court South, Winchester – Toilet and Kitchen Refurbishments

13th February 2017News

Refurbishment Works at Winchester Offices – Kitchens and Toilets for the Hampshire County Council.

RV Dart have now completed eight toilet refurbishments and  eight new kitchens refurbishments (working floor by floor) on this listed building framework project on behalf of Hampshire County Council. The project is due for completion in early May.

Romsey Methodist Church

2nd February 2017News

Romsey Methodist Church

This project at The Romsey Methodist Church consisted of two phases.  The first phase RV Dart completed last year. The job consisted of the refurbishment of the church and was completed in 2015.  The second phase of the project was for the refurbishment of the church hall. This phase of the job was completed in early 2017.

The contract administrator was Stone Ecclesiastical.  The contract was a JCT Minor Works with contractor design and both phases of the work had a build value of £120K.    

 

Chaddisbrook House

18th January 2017News

RV Dart completed an extension, alterations and refurbishment to form a new Cafe facility. The extension to ‘Discoveries’ Charity Shop and formation of offices and counselling rooms to St Peter’s Church, Reading Rd. Yateley.  We were on site with this project for 35 weeks and the approximate build value was £800K.

Shakespeare Junior School

6th January 2017EducationNews

The job was a fast track summer holiday project at the Shakespeare Junior School, Eastleigh. This was a demolition of an existing covered external space between two buildings. The project then consisted of the formation of a new extension to link the two buildings, providing a new entrance, lobby, reception, medical room and teaching / circulation space.  The first two images at the top are taken of the old covered external space.  The lower two photographs show the completed new works.shakespear2shakespeare-school1

Shakespeare Schoolshakespeare4

 

LP3-1200x900.jpg

Longparish Village Hall

4th January 2017Private Sector

Longparish Village Hall

This project for the client was to provide a new single storey extension to an existing hall. The extension will provide a secure storage area for event equipment and effects. RV Dart also extended and completely resurfaced the car park area.

Winchester-Uni-1200x900.jpeg

Strength and Conditioning Lab

5th October 2016News

RV Dart completed the strength and conditioning lab. This was part of a refurbishment this summer at the Centre for Sport at the University of Winchester.

JCT intermediate contract

Contract – May – September 2016

Outurn cost – £425k

Architect/Principal Designer – Studio 4, Winchester

QS – Ridge

Services Engineer – ITD

Structural Engineer – Paul Tanner Associates

RV Dart Supports Road Safety

13th July 2016News

Safety At The School Gates!

RV Dart supports Safer Roads in Hampshire and in particular Safety at the School Gates.  Beware of children crossing! Give cyclists three feet of space.

RV Dart Road Safety.jpeg