Chaddisbrook House

18th January 2017News

RV Dart completed an extension, alterations and refurbishment to form a new Cafe facility. The extension to ‘Discoveries’ Charity Shop and formation of offices and counselling rooms to St Peter’s Church, Reading Rd. Yateley.  We were on site with this project for 35 weeks and the approximate build value was £800K.

Shakespeare Junior School

6th January 2017EducationNews

The job was a fast track summer holiday project at the Shakespeare Junior School, Eastleigh. This was a demolition of an existing covered external space between two buildings. The project then consisted of the formation of a new extension to link the two buildings, providing a new entrance, lobby, reception, medical room and teaching / circulation space.  The first two images at the top are taken of the old covered external space.  The lower two photographs show the completed new works.shakespear2shakespeare-school1

Shakespeare Schoolshakespeare4

 

Winchester-Uni-1200x900.jpeg

Strength and Conditioning Lab

5th October 2016News

RV Dart completed the strength and conditioning lab. This was part of a refurbishment this summer at the Centre for Sport at the University of Winchester.

JCT intermediate contract

Contract – May – September 2016

Outurn cost – £425k

Architect/Principal Designer – Studio 4, Winchester

QS – Ridge

Services Engineer – ITD

Structural Engineer – Paul Tanner Associates

RV Dart Supports Road Safety

13th July 2016News

Safety At The School Gates!

RV Dart supports Safer Roads in Hampshire and in particular Safety at the School Gates.  Beware of children crossing! Give cyclists three feet of space.

RV Dart Road Safety.jpeg

Winton Chapel, University of Winchester

18th May 2016News

The Winton Chapel, University of Winchester

The Winton Chapel at the University of Winchester was originally built in 1880 and extended in 1927. The chapel was recently renovated and extended by RV Dart in readiness for the 135th anniversary celebrations. The Winton Chapel forms an important part of the University of Winchester and hosts music concerts and war memorial services.

The project reached practical completion on Monday 16th May.

 

 

 

 

 

Architect: Design Engine – David Gausden / Tamsin Thomas   

Structural Consultant: Paul Tanner Associates

Electrical Consultant: Chris Reading Associates

Mechanical Consultant:  Robertson Cartwright Design

Quantity Surveyor: Evolution 5

Contract: JCT Prime Cost Contract

Outturn Cost:  £1.3M